Menu

Megatron Case Study

09-08-2015

***The Challenge***: The description of the job was pretty mundane. Can you send along a combination unit to empty out some drains which would in turn allow the contractor to handover their works to their client; a local hospital. Straight forward enough you would say. Anyway, circumstances conspired to result in Megatron attending the job, and as it turned out, that was definitely a good thing... ***The Solution***: Megatron instantly began to recover vast amounts of rubble and other unknown tenacious items from depths of over 50m’s. The rattle of debris shooting up the suction boom and into the main hold continued, with Megatron pumping back/recycling waste water. Stopping temporarily we identified what was still lying in the sewer, examined the filters in Megatron and carried out an inspection to make sure the sheer volume of coarse material hadn’t taken a toll on Megatron. Megatron continued to show its capabilities and finished the job with no issues or problems whatsoever. Site management were horrified identifying the extent of the material found, which was there before they had started work.

Visit the Hydro Cleansing website for more information on Megatron Case Study

ENQUIRY FORM

More News

  • Megatron Case Study

  • Water pollution: the extinction of a planet - Published July 15, 2015

  • Business Continuity @ Canary Wharf Case Study

  • Touching facts about Food waste - Published July 23, 2015