Menu

Business Continuity @ Canary Wharf Case Study

09-08-2015

***The Challenge***: The call came at lunchtime one Friday. Our client had a blockage in their drainage system which could not be specifically traced but was creating a need for toilet blocks to be closed within their twelve storey building and people to be redeployed to other adjacent locations. Their system was perceived to be generating a build up in pressure, and as it was routed via various critical facilities including the plant room housing the uninterrupted power supply, a solution was sought urgently to prevent closure of the building a series of consequential financial impacts to the business. ***The Solution***: By 19.00 hrs that evening a team was deployed with a range of equipment including Megatron as the centre piece. The team worked their way through the network of drains including the vast stack pipe supporting the whole side of this building which had a history of these issues dating back several years. Accessing the network at various points and applying a combination of Megatron's vacuum pump and high pressure jetting operating at distances of over 300 metres, the building was eventually cleared by 02.00 hrs in the morning. We were able to demonstrate this by applying Megatron's vacuum pump to the base of the stack pipe and systematically emptying toilets via suction from ten floors above. The building has had no further problems. Clearly Megatron is a step outside the normal expectations of the market, but so are the results of the work undertaken. We certainly recognize that Megatron is not designed to compete financially with companies focused upon the rate per day as obviously the cheaper and less specified vehicle will always win. But for those clients out there, that recognize the full financial consequence of lost productivity, and the opportunity to reduce maintenance spend by achieving new levels of cleanliness, there is no match to Megatron.

Visit the Hydro Cleansing website for more information on Business Continuity @ Canary Wharf Case Study

ENQUIRY FORM

More News

  • Megatron Case Study

  • Water pollution: the extinction of a planet - Published July 15, 2015

  • Business Continuity @ Canary Wharf Case Study

  • Touching facts about Food waste - Published July 23, 2015